Work has begun on the pitch as we begin to be ready for the start of preseason
Currently the pitch is undergoing 80 tonnes of a 70/30 mix of sand and top soil, before it will be drill seeded with MM60 seed. This will be followed up with aeration and fertiliser feed.
We will keep fans up-top date with the pitch works as we work towards being ready for the new season.